 |
Available in multiple configurations to suit all mission profiles for 727-100s and 727-200s, these kits are the most economical, least invasive Stage 3 System available.
- Short installation downtime
- No changes in the engines
- No structural changes or winglets that could jeopardize Boeing support
- Negligible increase in OEW (7 to 99 lbs depending on configuration)
- No performance loss
- Increased list from high altitude airports
- No changes in cockpit procedures
- No changes in crew training
|
KIT
|
MTOW*
|
MLW*
|
Installation
Man-Hours**
|
|
727-100 |
172,200 lbs
|
142,500 lbs
|
30
|
|
Standard (SGW) 727-200 |
166,400 lbs
|
153,500 lbs
|
30
|
|
Increased (IGW) 727-200 |
179,700 lbs
|
166,000 lbs
|
114
|
|
Heavy (HGW) 727-200 |
180,000 lbs
up to 201,200 lbs
|
166,000 lbs
|
215
|
|
|
|
|
|
|
* Noise-limited weights |
|
** Installation hours based on the assumption that prerequisite hardware is already installed and indicate the totals required from that baseline; they are not cumulative. |
|
 |